| Interior |
| Steps Shaffer Painting takes for a beautiful interior |
|
| Step 1 |
- Rooms and areas to be painted are scheduled with the customer.
- Large furniture is moved into the center of the room.
- Wall and ceiling fixtures are removed.
- Furniture is covered with plastic.
- Floors are covered with drop cloths.
|
   |
|
| Step 2 |
- Walls are scuff-sanded.
- Holes and cracks in walls are filled.
- Gaps in trim are caulked.
- Stains, such as water marks, are sealed.
- Washing is done where required.
|
|
| Step 3 |
- Repaired areas are primed.
- Paint is applied with a brush, roller or sprayer depending on the surface.
- Ceiling and walls are painted to proper coverage and finish color.
- Clean cut line between trim and walls.
- Only premium quality paints are used.
|
   |
 |
|
| Step 4 |
- Furniture is moved back to original positions.
- Wall and ceiling fixtures are replaced.
- Floors and carpets are thoroughly vacuumed and swept.
- All garbage is removed.
- Touch-up paint is labeled and left with the customer.
|
   |
  |
|
| Step 5 |
- Before the crew packs up their equipment, a "wet walk-through" is done to ensure all contacted areas are painted properly.
- Final touch-ups are noted on a "punch list" and are completed before the crew leaves.
|